« Home « Kết quả tìm kiếm

Exam :640-441 Cisco Certified Design Associate - Version Number:6.0


Tóm tắt Xem thử

- All other use of the network occurs in normal business hours.
- View the Case Study for the FSI Test Equipment case study, what is a fact to consider in establishing the customer’s acceptance criteria of the networks?.
- Answer: A Q.13.
- Answer: D Q.25.
- Answer: B Q.26.
- Answer: D Q.27.
- Answer: B Q.28.
- Answer: A Q.29.
- Answer: C Q.31.
- Answer: B Q.33.
- Answer: A Q.39.
- Answer: D Q.48.
- Answer: B Q.49.
- Reduces the size of the cell window..
- Answer: D Q.53.
- Answer: D Q.55.
- Information on the exact model and features of the AS400 will be required..
- Answer: B Q.56.
- Answer: D Q.57.
- Answer: A Q.58.
- Answer: C Q.62.
- For the Leviathan Systems case study, what would most likely be your first step when your diagram the packet flow of the 5250 terminal emulation application over the network?.
- Answer: C Q.65.
- Answer: A Q.66.
- Redundancy in the network topology..
- Consistent use of the Network Time Protocol (NTP) D.
- Consistent use of the Time To Live field in the IP header..
- Answer: B Q.72.
- For the Leviathan Systems case study, what is a fact to consider in establishing Leviathan’s acceptance criteria of the new network?.
- Answer: A Q.76.
- Proactive management means all of the following except:.
- 802.2 Answer: B, C, D.
- AAL.5 Answer: C.
- Answer: A Q.81.
- What is the purpose of the apple talk AARP protocol?.
- Answer: D Q.85.
- Answer: B Q.86.
- Answer: A Q.88.
- of the traffic on LAN, performance degrades?.
- Answer: B Q.89.
- Answer: B Q.91.
- Answer: A Q.93.
- For the EIC Satellite Systems case study, what is a fact to consider in establishing EIC acceptance criteria of the new network?.
- In order to “phase in” the new system, what would be the most logical first step?.
- Then phase in the rest of the network..
- Answer: D Q.101.
- Answer: D Q.105.
- In the Leviathan Systems case study, which statement describes the performance characteristics of the existing network?.
- Answer: A Q.109.
- What it NOT a function of the distribution layer?.
- Answer: C Q.112.
- Answer: C Q.113.
- A detailed prototype of the network should be tested first before any installation..
- Answer: C Q.116.
- As a guideline, none of the network segments should have more then.
- Answer: B Q.119.
- A high-level topology of the customer’s current network..
- A high-level topology of the customer’s proposed network..
- A detailed topology of the customer’s proposed network..
- Answer: B Q.123.
- Which statement is true about the design goals of the different technologies?.
- What is the name of the NetWare protocol that advertises NetWare services?.
- Answer: C Q.133.
- LAPB is a denotative of the SDLC protocol.
- Proactive network management means all of the following except:.
- Answer: C Q.137.
- Answer: B Q.140.
- Answer: B Q.146.
- Answer: D Q.147.
- Answer: D Q.150.
- Answer: D Q.152.
- The hub grants access to the network medium based upon priority of the transmission..
- Answer: D Q.154.
- Answer: B Q.155.
- Answer: C Q.157.
- Answer: D Q.158.
- Answer: C Q.165.
- What is the name of the NetWare protocol that advertises netware services?.
- Answer: C Q.174.
- Answer: A Q.177.
- Answer: A Q.182.
- Answer: B Q.183.
- Answer: C Q.186.
- Information in the exact model and features of the AS400 system will be required..
- Answer: B Q.187.
- Answer: B Q.188.
- Answer: B Q.192.
- Answer: A Q.203.
- Answer: B Q.206.
- What is NOT a function of the distribution layer?.
- Answer: C Q.213.
- Answer: D Q.216.
- What is the function of the OSPF designated router?.
- For the Leviathan Systems case study, what would most likely be your first step when you diagram the packet flow of the 5250 terminal emulation application over the network?.
- Answer: D Q.222.
- It increases the complexities of the network..
- Answer: B Q.225.
- High level topology map of the customer’s proposed e-mail packet flow..
- High level topology map of the customer’s proposes intranet security system..
- High level topology map of the customer’s proposed terminal emulation packet flow..
- In the EIC satellite system case study, management’s most critical concern is the speed of the ISDN lines to the sales office

Xem thử không khả dụng, vui lòng xem tại trang nguồn
hoặc xem Tóm tắt